- The G&M Contracting team meets with you to discuss viability and preliminary project program (scope, duration, and budget scenarios).
- Referral package.
- Tour of complete project(s) and introduction of project manager(s)
- With framework for the preliminary project program (scope, duration, and costs), the agreement is signed.
- Coordinate preliminary schematic design(s).
- Review plans to establish cost and timeline based on preliminary schematic design(s).
- Based on design coordinate the construction set of plans.
- Assist as required with selection process for items such as fixtures, cabinetry and tile.
- Derive final pricing and timeline from complete construction set of plans, specifications, and selections.
- Commence construction following permit approval.
- Conduct regular on-site meetings (builder, designer, client)
- Continue to assist as required with selection process for items such as fixtures, cabinetry and tile.
- Punch out.
- G&M Contracting is so confident about the quality and integrity in applying our craft that all work performed by G&M Contracting, Inc. is fully guaranteed against faulty workmanship for five (5) full years from the original date of completion.
- If as a result of faulty workmanship additional work is required the client will not be charged for the cost of the repair. Certain terms and conditions apply. Sign Fixed Price, Fixed Schedule Construction Contract
|
|
| |
|
|
| |
|